Submittal register

Projects › Skagit Bluff › Submittals
QC Plan accepted for: rock cuts, rock bolts. NOT accepted for shotcrete — under SS 101.02.01 no work may be undertaken on that element until the Ministry accepts the QC Plan for it.
Filter

Owed by us

SubmittalTriggerDueClauseBlocks
As-built blast design — BL-14blast fired 25 Aug 14:20in 6h204.04.09TYPE A EXCAVATION
Seismograph records — BL-14blast firedin 6h204.04.11TYPE A EXCAVATION
Peak overpressure record — BL-14blast firedin 6h204.04.12TYPE A EXCAVATION
Daily Rock Bolt Testing and Tensioning Record — 26 Augday of bolt operationsin 18h206.04.03ROCK BOLTS
Blast design — BL-15drilling starts 3 Sep3 Sep204.04.07
Jack calibration certificateinstallation start5 working days ahead206.04.02ROCK BOLTS

Every due date is derived from the clause that creates it, never typed in. That is why each row names its clause.

Awaited from others a different conversation from our own backlog

DocumentFromDueClauseChase history
Blasting consultant field report — visit 25 AugIndependent consultantoverdue 2 days204.04.1026 Aug (phone)
28-day shotcrete result — panel SP-08CCIL laboratory12 Sep209.91
Vibration specialist interpretation — BL-14Vibration specialistin 6h204.04.11

Returned for revision

SubmittalReturnedReason
Rock bolt system documentation22 AugResin UCS-vs-time graph missing

Inadequate or incorrect submittals are returned for revision before acceptance — a real state, not an error.

Layout as specified in SCR-014-submittal-register.md
┌──────────┬─────────────────────────────────────────────────────┐
│ NAV      │ Projects › Skagit Bluff › Submittals   [status ▾]   │
│          ├─────────────────────────────────────────────────────┤
│          │ ⚠ QC Plan accepted for: rock cuts, rock bolts.      │
│          │   NOT accepted for shotcrete — no work may be       │
│          │   undertaken on that element (SS 101.02.01)         │
│          ├─────────────────────────────────────────────────────┤
│          │ OWED BY US                                          │
│          │ ⏱ As-built blast design BL-14   due 6h  204.04.09   │
│          │ ⏱ Seismograph records BL-14     due 6h  204.04.11   │
│          │ ⏱ Peak overpressure BL-14       due 6h  204.04.12   │
│          │ ⏱ Daily bolt record 26 Aug      due 18h 206.04.03   │
│          │ ○ Blast design BL-15            due 3 Sep 204.04.07 │
│          ├─────────────────────────────────────────────────────┤
│          │ AWAITED FROM OTHERS                                 │
│          │ ◷ Consultant field report, visit 25 Aug             │
│          │   overdue 2 days · chased 26 Aug (phone) · 204.04.10│
│          │ ◷ Lab 28-day shotcrete result, panel SP-08          │
│          │   expected 12 Sep · CCIL lab ____ · 209.91          │
│          ├─────────────────────────────────────────────────────┤
│          │ RETURNED FOR REVISION                               │
│          │ ↩ Rock bolt system documentation — resubmit         │
└──────────┴─────────────────────────────────────────────────────┘

Implements spec/03-screens/SCR-014-submittal-register.md · SCR-014 · URL /projects/{project}/submittals · Personas QC, TECH · Stories US-QC-001, US-QC-003, US-TECH-007, US-QC-014