PROPOSEDDynamite Construction has not asked for this. Every screen in this prototype is an Altumo proposal. Serves OPP-005OPP-006OPP-009
Demo states

⏱ Due on a clock

As-built blast design — Skagit Bluff BL-146h left

Fired 25 Aug 14:20. Seismograph records and the signed peak-overpressure record are due on the same clock.

due 26 Aug 14:20 · SS 204.04.09
Occupant notices — Vernon 35th St48h rule

6 occupied structures within 150 m; 1 medical clinic at 280 m. Blasting is planned for 09:00 on 3 Sep.

send by 09:00, 1 Sep · OHS Reg. s. 21.90(1)

💰 Holding payment

Pay itemContractBlocked byOwed byHeld
SHOTCRETE86002MJ459928-day result, panel SP-08Laboratory25% of item
ROCK BOLTS86002MJ4599Daily Rock Bolt Testing and Tensioning Record, 26 AugUs100% of item
TYPE A EXCAVATION86002MJ45993 of 8 Section 204 documents outstandingUs100% of item

MoTI SS 101.01 — “The Contractor will not be entitled to payment for Work that lacks the appropriate Quality Control documentation.”

⚠ Corridor

Hwy 1 — Fraser CanyonRisk HIGH

Reopened to limited travel 26 Aug 18:56 after a closure since 7 July caused by the Brunswick wildfire complex. Single-lane alternating with pilot vehicle through a 2 km section.

Source: DriveBC Open511 · BC Gov News, Ministry of Transportation and Transit. ECCC alerts reproduced unaltered under the ECCC Data Servers End-use Licence v2.1.

Open the corridor

◷ Awaiting others

Blasting consultant field report — visit 25 AugOverdue 2 days

Due within one day of each site visit. The consultant is contractually independent of us, of any explosives manufacturer and of any distributor.

was due 26 Aug · SS 204.04.10, independence per SS 204.03.02
Layout as specified in SCR-002-home.md
┌──────────┬─────────────────────────────────────────────────────┐
│ NAV      │  Today · Thursday 27 August 2026        [persona]   │
│          ├─────────────────────────────────────────────────────┤
│ Today    │  ⏱ DUE ON A CLOCK                                   │
│ Watch    │  ┌─────────────────────────────────────────────┐    │
│ Pursue   │  │ As-built blast design — Skagit Bluff BL-14  │    │
│ Projects │  │ due in 6h · SS 204.04.09                    │    │
│ Blasting │  ├─────────────────────────────────────────────┤    │
│ Explos.  │  │ Occupant notices — Vernon 35th St · 6 within │   │
│ Ground   │  │ 150 m · send by 09:00 tomorrow · s. 21.90   │    │
│ Rope     │  └─────────────────────────────────────────────┘    │
│ Product. │                                                     │
│ People   │  💰 HOLDING PAYMENT                                  │
│ Complnce │  ┌─────────────────────────────────────────────┐    │
│ Record   │  │ Shotcrete 28-day results · $  held on 3 items │  │
│ Operate  │  │ Daily bolt record 25 Aug · not submitted     │   │
│          │  └─────────────────────────────────────────────┘    │
│          │                                                     │
│          │  ⚠ CORRIDOR                                         │
│          │  ┌─────────────────────────────────────────────┐    │
│          │  │ Hwy 1 Fraser Canyon — reopened limited      │    │
│          │  │ 26 Aug 18:56 after 7-week wildfire closure  │    │
│          │  └─────────────────────────────────────────────┘    │
└──────────┴─────────────────────────────────────────────────────┘

Implements spec/03-screens/SCR-002-home.md · SCR-002 · URL /today · Personas all · Stories US-OWN-006