Blast schedule

Projects › Skagit Bluff › Blasting
🛑 BLASTING SUSPENDED on Vernon 35th St. PPV 4.1 mm/s exceeded the plan limit of 3.0 mm/s. Under s. 21.92 all blasting is suspended until a person meeting the s. 21.91(a) qualifications determines why and updates the plan if necessary. Open the monitoring record
SeqProposedDesignConsultant visitPre-blast surveyNoticesZone
BL-1425 Aug — FIREDsigneddonedonesentyes
↳ as-built, seismograph records and peak overpressure record due in 6hopen the blast record
BL-153 Sepunsigned27 Augnot started6 occupants dueyes
design due today — the one-week lead before drilling commences (SS 204.04.07). Open the design
BL-1611 Sepnot startedno

Sequence — SS 204.04.05 general construction plan

SeqLocation relative to remaining rockApprox dimensionsEstimated volumeDisposal site
BL-14Zone 3, upper bench140 m × 6 m lift2,400 m³Zone 7 stockpile
BL-15Zone 4, upper bench140 m × 6 m lift2,600 m³Zone 7 stockpile
BL-16Zone 5, second lift120 m × 6 m lift2,100 m³Zone 7 stockpile

Note: “estimated volume” here is a required specification field about rock, not a project estimate. No duration, effort or cost estimate appears on this screen.

Open field mode for BL-15 Notices
Layout as specified in SCR-018-blast-schedule.md
┌──────────┬────────────────────────────────────────────────────┐
│ NAV      │ Projects › Skagit Bluff › Blasting     [+ blast]   │
│          ├────────────────────────────────────────────────────┤
│          │ Seq  Date    Design      Survey  Notices  Zone     │
│          │ ─────────────────────────────────────────────────  │
│          │ BL-14 25 Aug ✔ signed    ✔       ✔ sent   yes      │
│          │       FIRED · as-built due in 6h  →                │
│          │ BL-15  3 Sep ⚠ unsigned  ○       ⚠ 6 occ- yes      │
│          │       consultant visit ✔ 27 Aug   upants due       │
│          │       DESIGN DUE — 1 week lead is today            │
│          │ BL-16 11 Sep ○ not started ○     ○        no       │
│          ├────────────────────────────────────────────────────┤
│          │ 🛑 BLASTING SUSPENDED on Vernon 35th St             │
│          │   PPV 4.1 exceeded plan limit 3.0 · s. 21.92 ·     │
│          │   requires a determination by a qualified          │
│          │   professional before any blasting resumes  →      │
│          ├────────────────────────────────────────────────────┤
│          │ SEQUENCE (SS 204.04.05 general construction plan)  │
│          │ order of blasts · location · approx dimensions ·   │
│          │ estimated volume · disposal site                   │
└──────────┴────────────────────────────────────────────────────┘

Implements spec/03-screens/SCR-018-blast-schedule.md · SCR-018 · URL /projects/{project}/blasting · Personas TECH, QC · Stories US-TECH-002, US-TECH-006