PROPOSEDDynamite Construction has not asked for this. Every screen in this prototype is an Altumo proposal. Serves OPP-015

Enquiry

Pursue › Enquiries › Hwy 3 near Osoyoos
The slopeACTIVE HAZARD
What is failingRock on shoulder, ongoing
How it was noticedBy a crew passing on 27 Aug
Approx height~18 m
Approx length~40 m
What is belowTwo travel lanes
Closure in placeSingle lane alternating
Geotechnical engineer engagedYes — named
Photographs3

None of these fields exists on the current published contact form, which captures name, company, email, phone, project location and a free-text description.

Corridor context

Hwy 3 · DriveBC event open since 06:10 today

Risk LOW · 9 candidate cuts on this corridor

Past work here: Anarchist Viewpoint slope stabilization — 2,500 m² scaling, 250 m rock bolts, 81 m³ shotcrete

This context would not exist without the rest of the system. An enquiry about a highway that already shows an open event is a different conversation.

Contact and response
Received27 Aug 09:14 · public form
Response clock2h 40m of one business day
Layout as specified in SCR-010-enquiry-detail.md
┌──────────┬────────────────────────────────────────────────────┐
│ NAV      │ ‹ Enquiries    Hwy 3 near Osoyoos    ACTIVE HAZARD │
│          ├────────────────────────────────────────────────────┤
│          │ THE SLOPE                    │ CORRIDOR CONTEXT    │
│          │ What is failing  rock on     │ Hwy 3 · DriveBC     │
│          │   shoulder, ongoing          │ event open since    │
│          │ Noticed          by crew     │ 06:10 today  →      │
│          │ Approx height    ~18 m       │ Risk: LOW           │
│          │ Approx length    ~40 m       │ 9 candidate cuts    │
│          │ What is below    2 lanes     │ on this corridor →  │
│          │ Closure          single lane │                     │
│          │ Engineer engaged yes — name  │ Past work here:     │
│          │ Photographs      3 attached  │ Anarchist Viewpoint │
│          ├────────────────────────────────────────────────────┤
│          │ CONTACT   name · company · email · phone           │
│          │ RECEIVED  27 Aug 09:14 · via public form           │
│          │ RESPONSE  ⏱ 2h 40m of one business day             │
│          ├────────────────────────────────────────────────────┤
│          │ [ record response ]  [ convert to project ]        │
└──────────┴────────────────────────────────────────────────────┘

Implements spec/03-screens/SCR-010-enquiry-detail.md · SCR-010 · URL /pursue/enquiries/{id} · Personas OWN · Stories US-OWN-008