Skagit Bluff — rope access planv4 · in force
Required before a rope access system is installed or used, and available at the workplace including offline.
| Element — s. 34.3(2) | Recorded | |
|---|---|---|
| 1 | The hazards associated with the work | loose rock · exposure · weather |
| 2 | How hazards and risks will be eliminated or controlled | recorded |
| 3 | Description of the rope access system | two-rope: working line + independent backup |
| 4 | Types and locations of anchorages | mapped — anchor register |
| 5 | Procedures to assemble, maintain, inspect, use and disassemble | recorded |
| 6 | The name and duties of each member of the work team | live from today's crew roster ↓ |
| 7 | Appropriate personal protective equipment | headgear with a 3-point chin strap · harness · connectors |
| 8 | Emergency response, evacuation and rescue procedures | recorded · dedicated rope rescue team maintained on site throughout operations |
Work team a crew change is a plan change
| Person | Certification | Duties | Trained in this plan |
|---|---|---|---|
| A. Singh | IRATA L3 | supervisor · rescue lead | documented |
| R. Toews | IRATA L2 | scaling | documented |
| M. Deol | SPRAT L1 | scaling | added today — plan versioned to v4 |
Certification must be documented by the employer, held at the workplace, and produced on an officer's request. A rostered person without one cannot be added to the team.
Layout as specified in SCR-034-rope-access-plan.md
┌──────────┬─────────────────────────────────────────────────────┐ │ NAV │ Skagit Bluff › Rope access › Plan v4 · in force │ │ ├─────────────────────────────────────────────────────┤ │ │ 1 HAZARDS loose rock · exposure · weather │ │ │ 2 CONTROLS how each is eliminated/controlled │ │ │ 3 SYSTEM two-rope · working + backup line │ │ │ independent anchor connections │ │ │ 4 ANCHORAGES types and locations ▨ (map) │ │ │ 5 PROCEDURES assemble · maintain · inspect · │ │ │ use · disassemble │ │ │ 6 WORK TEAM ← live from today's crew roster │ │ │ A. Singh IRATA L3 · supervisor · rescue lead │ │ │ R. Toews IRATA L2 · scaling │ │ │ M. Deol SPRAT L1 · scaling │ │ │ ⚠ new member added today — plan version bumped │ │ │ each trained in this plan and knows their duties ▨│ │ │ 7 PPE headgear (3-point chin strap) · │ │ │ harness · connectors │ │ │ 8 RESCUE prompt rescue procedure ▨ │ │ │ dedicated rope rescue team on │ │ │ site throughout operations │ │ ├─────────────────────────────────────────────────────┤ │ │ Available at the workplace ✔ offline ✔ │ └──────────┴─────────────────────────────────────────────────────┘
Implements spec/03-screens/SCR-034-rope-access-plan.md · SCR-034 · URL /projects/{project}/rope-access/plan · Personas SUPV · Stories US-SUPV-002