PROPOSEDDynamite Construction has not asked for this. Every screen in this prototype is an Altumo proposal. Serves OPP-001
‹ back
⚠ OFFLINE · 4 records queued · 38 min

BL-15 · Skagit Bluff

Before

Blast site = at least 15 m in every direction from where explosives are stored outside a magazine, placed or primed.

The log

A. Singh · R. Toews

emulsion 248 kg · det cord 180 m · 46 detonators (electronic)

This choice also determines the misfire waiting period.

Fire

▶ 12 short whistle signals at one-second intervals

▶ Two minutes must elapse after the last warning signal before initiating

1:48
After
⚠ Misfire suspected → hold
Attach seismograph & overpressure Report an incident
Layout as specified in SCR-020-blast-field.md
┌──────────────────────────────────────────────────────────────┐
│ ‹ back    BL-15 · Skagit Bluff        ⚠ OFFLINE · 4 queued   │
├──────────────────────────────────────────────────────────────┤
│  BEFORE                                                      │
│  ☐ Previously blasted area exposed and examined for misfires │
│  ☐ Faces/slopes cleared of loose material or stabilized      │
│  ☐ Utility service locations determined and clearly marked   │
│  ☐ Warning procedure and signals POSTED at the operation     │
│  ☐ Notice of Project posted at the blast site (zone: yes)    │
│  Blast site = ≥15 m in every direction  ▨ danger area set    │
├──────────────────────────────────────────────────────────────┤
│  THE LOG                                                     │
│  Time  [ 14:20 ]  Date [ 3 Sep ]  Location [ 12+400–12+540 ] │
│  Blaster of record   [ ______ ]  cert ____                   │
│  EVERYONE who handled explosives                             │
│   [ + add person ]  · A. Singh · R. Toews                    │
│  Explosives   from day box DB-04:                            │
│   emulsion 240 kg · det cord 180 m · 42 detonators (elec)    │
│   [ adjust actual used ]                                     │
│  Initiating device  [ electronic ▾ ]                         │
├──────────────────────────────────────────────────────────────┤
│  FIRE                                                        │
│  ▶ 12 short whistles at 1-second intervals    [ start ]      │
│  ▶ 2 minutes must elapse before initiating    [ 1:48 ]       │
│  ▶ [ RECORD FIRED ]                                          │
├──────────────────────────────────────────────────────────────┤
│  AFTER                                                       │
│  Post-blast examination for misfires   [ record result ]     │
│  ⚠ misfire suspected? → misfire hold                         │
│  All clear: one prolonged whistle ≥5 s  [ sounded ]          │
│  Permission for work to proceed given    ☐                   │
└──────────────────────────────────────────────────────────────┘

Implements spec/03-screens/SCR-020-blast-field.md · SCR-020 · Personas BLAST · Stories US-BLAST-002, US-BLAST-003, US-BLAST-008, US-BLAST-009, US-BLAST-010, US-BLAST-011