PRODUCTION · 27 Aug · Skagit Bluff

Constraints today
DFO instream window15 Aug – 15 Sep · Similkameen R. — a per-waterbody determination ✔ inside
ECCC nesting zone B4mid-April – late August ⚠ inside → nest survey by a qualified person required
Ambient4 °C — cold-weather shotcrete rules apply

ECCC publishes nesting periods as “mid-April” and “late August”, never as fixed calendar days — and an active nest is protected regardless of the period.

Quantities by pay item
Crew and equipment hours

A. Singh 8.0 · R. Toews 8.0 · M. Deol 6.5

Klemm KR806 #1 6.0 h · excavator 4.5 h

Rig hole record
Interruptionsstructured reasons, not a note
09:40–10:05Rail traffic passage25 min
11:15–12:00Engineer hold — next lift blocked pending stabilization45 min
14:20–14:35Traffic control window15 min

productive 6 h 35 m of 8 h 00 m

Both figures stay visible. A metres-per-shift number that does not record why the shift stopped is not a rate.

Layout as specified in SCR-044-daily-production.md
┌──────────────────────────────────────────────────────────────┐
│ ‹ back   PRODUCTION · 27 Aug · Skagit Bluff  ⚠ OFFLINE       │
├──────────────────────────────────────────────────────────────┤
│  CONSTRAINTS TODAY                                           │
│   DFO window 15 Aug–15 Sep (Similkameen R.) ✔ inside         │
│   ECCC nesting zone B4: mid-April–late August ⚠ inside       │
│    → nest survey by a qualified person required              │
│   Ambient 4 °C — cold-weather shotcrete rules apply          │
├──────────────────────────────────────────────────────────────┤
│  QUANTITIES BY PAY ITEM                                      │
│   ROCK BOLTS       [ 66 ] m installed (length of bar in rock)│
│   SLOPE MESH       [ 180 ] m² of slope meshed area           │
│   TYPE A EXCAV.    [ 0 ] m³                                  │
│   SHOTCRETE        [ 0 ] m³   placed   [ 0 ] rebound         │
├──────────────────────────────────────────────────────────────┤
│  CREW & EQUIPMENT HOURS                                      │
│   A. Singh 8.0 · R. Toews 8.0 · M. Deol 6.5                  │
│   Klemm KR806 #1  6.0 h    excavator  4.5 h                  │
├──────────────────────────────────────────────────────────────┤
│  INTERRUPTIONS                            [ + interruption ] │
│   09:40–10:05  rail traffic passage       25 min             │
│   11:15–12:00  engineer hold — next lift  45 min             │
│                blocked pending stabilization                 │
│   14:20–14:35  traffic control window     15 min             │
│   ─────────────────────────────────────────────────────      │
│   productive 6h 35m of 8h 00m                                │
└──────────────────────────────────────────────────────────────┘

Implements spec/03-screens/SCR-044-daily-production.md · SCR-044 · Personas SUPV · Stories US-SUPV-006, US-SUPV-007, US-SUPV-008, US-SUPV-010, US-SUPV-011