ROPE ACCESS LOGS · 27 Aug
A. Singh — IRATA L3confirmed
| Type of work | scaling |
| Rope access system | two-rope, working + backup |
| Structure worked on | rock face, highway cut |
| Hours on rope | 5.5 |
R. Toews — IRATA L2confirmed
scaling · two-rope · rock face · 5.5 h
M. Deol — SPRAT L1not confirmed
Cannot be counter-signed until M. Deol confirms their own entry. The log is the technician's own record — a supervisor signing an unconfirmed entry would defeat its purpose.
Counter-sign as supervisor or manager in charge
2 of 3 entries ready
Signed with your identity and the time, against each entry. Entries are kept in chronological order in each technician's own personal log,
current and available at the workplace for inspection.
Layout as specified in SCR-035-rope-access-logs.md
┌───────────────────────────────────────────────────────────────┐ │ ‹ back ROPE ACCESS LOGS · 27 Aug ⚠ OFFLINE │ ├───────────────────────────────────────────────────────────────┤ │ A. SINGH — IRATA L3 [ confirmed ✔ ] │ │ work type scaling │ │ system two-rope, working + backup │ │ structure rock face, highway cut │ │ hours on rope 5.5 │ │ │ │ R. TOEWS — IRATA L2 [ confirmed ✔ ] │ │ scaling · two-rope · rock face · 5.5 h │ │ │ │ M. DEOL — SPRAT L1 [ not confirmed ] │ │ ⚠ cannot be counter-signed until M. Deol confirms │ │ │ ├───────────────────────────────────────────────────────────────┤ │ COUNTER-SIGN as supervisor / manager in charge │ │ 2 of 3 entries ready │ │ [ COUNTER-SIGN 2 ENTRIES ] │ │ signed by ______ at ______ │ ├───────────────────────────────────────────────────────────────┤ │ Each log stays with its technician, in chronological order, │ │ current and available at the workplace for inspection. │ └───────────────────────────────────────────────────────────────┘
Implements spec/03-screens/SCR-035-rope-access-logs.md · SCR-035 · Personas SUPV · Stories US-SUPV-003, US-SUPV-010